Decking is again a straight forward easy part of the process that decks a long time.
Building a pool deck step by step.
The critical steps here are a good foundation.
Deck screws down at an angle through the frame and into the tops of the posts photo 4.
Align the edge of the first length of decking boards with the outside edge of the beam.
As the building inspector said this is the stuff they put in the fancy houses.
As you install the decking boards perpendicular to the joists drive two fasteners through each board into the center of.
You heard it here first.
Posts installation previously marked places will equate you to keep in mind when the post should be installed.
Refer to the plan or use one of the assembled floor joist frames to position the pier blocks.
The building inspector said i was getting the fancy stuff.
Step 1 install the support posts.
Framing the floor the floor framing around the pool consists of 18 trapezoidal floor joist frames 4 sided.
Setting piers and posts the floor joist frames are supported by a series of 4 x 4 posts set in the concrete pier.
How to build a backyard pool deck step 1.
The first step in building an above ground pool deck is to mark and install your support posts based on the deck design.